Writing a transport contract: a clause checklist for SA operators
Most transport disputes in South Africa start with something nobody wrote down. The client thought the rate included tolls. The transporter thought six hours waiting at the mine was a reason to charge extra. Nobody agreed who would pay when a pallet of tiles arrived broken in Polokwane.
A written contract settles those questions before they turn into a fight. This guide gives you a checklist of clauses to cover. It is not legal advice and it is not a template. Every contract worth signing should be read by an attorney before you sign it, especially a long-term one where months of revenue depend on the wording.
One-off loads versus contracts
For a single load, a short written quote accepted by email or WhatsApp can be enough, as long as it covers the scope, the rate, payment and who carries the risk. Keep the message.
For regular work, such as a weekly run from Durban to Johannesburg or a six-month coal haul, you need a proper agreement. The amounts are bigger, the relationship lasts longer and fuel prices will move during the term.
The clause checklist
1. Parties
Use the full registered names, CIPC registration numbers, VAT numbers if registered and physical addresses of both parties. Name who signs for each and confirm they are authorised to.
If you subcontract, say whether the client allows it and whether you need their consent first.
2. Scope of the work
Be specific:
- Collection and delivery points, with addresses and site contacts.
- Type of cargo, packaging and the expected mass per load.
- Vehicle type: tautliner, flat deck, side tipper, refrigerated and so on.
- Volumes: loads per week or month, and whether these are guaranteed or estimates.
- Loading and offloading: who loads, who offloads, who supplies forklifts or labour.
- Operating hours at each site.
An estimated volume is not a promise. If you are buying a truck on the strength of the contract, ask for a minimum volume or a take-or-pay clause, and get advice on whether it is enforceable.
3. Rates
State the rate and the basis: per load, per ton, per kilometre or per day. Say whether it includes VAT, tolls, permits and escort fees.
Separate route-specific costs. A load from Johannesburg to Cape Town on the N1 has a different toll profile from one on the N3 to Durban. Name the route or say that tolls are charged at cost.
4. Fuel price adjustment
Diesel is usually the largest single cost, and the price changes monthly. On any contract longer than a month or two, include a fuel adjustment clause:
- Pick a base diesel price on a stated date, using the official published price from the Department of Mineral and Petroleum Resources (the official monthly fuel price announcement) for your zone (coastal or inland).
- Agree what share of the rate is fuel. This is often set somewhere between a quarter and a half of the rate, depending on the route and vehicle. Work it out from your own costs; don't copy someone else's number.
- Say how often the rate adjusts (monthly is common) and whether it moves both up and down.
Write out one worked example in the contract so both sides agree on the arithmetic.
5. Payment terms
Say when the invoice is issued (on delivery, on signed POD, weekly or monthly), how many days the client has to pay, the bank details and what happens if they pay late. Interest on overdue amounts should be stated as a rate, and an attorney can tell you what is allowed. Our payment terms guide covers this in more detail.
6. Liability and goods-in-transit cover
- State who carries the risk of loss or damage while the goods are on the truck.
- Name the limit of the transporter's liability. Many operators limit it per load or per kilogram, but a limit only helps if the client agreed to it in writing.
- Require the transporter to hold goods-in-transit (GIT) insurance, state the minimum cover per load, and ask for a copy of the policy schedule.
- Check what the GIT policy excludes. Common exclusions include unattended vehicles, certain high-risk goods and theft where the truck was parked outside an approved stop. If the contract asks for more than the policy covers, the difference comes out of your pocket.
- Say how and when damage must be reported, for example noted on the POD and confirmed in writing within a set number of days.
7. Delays and demurrage
Waiting time costs you money. Agree:
- How many free hours are allowed at loading and offloading.
- The demurrage rate per hour or per day after that.
- How waiting time is proved, such as gate times, tracking data or a signed time sheet.
- What happens with delays outside anyone's control, such as border closures, strikes, floods or road closures. This is the force majeure clause.
8. Proof of delivery
State what counts as delivery: a signed and stamped POD, a photo, an electronic signature. Payment usually depends on it, so make the requirement clear.
9. Term and termination
- Start date and end date, or a rolling term with a notice period.
- How either side can end the contract early: notice in writing, and how many days.
- Termination for breach: what counts as a material breach, and how long the other side has to fix it after being told.
- What happens to loads in progress and outstanding invoices when the contract ends.
10. Disputes
Lay out the steps: first a meeting between named managers, then mediation or arbitration if that fails, and court only as a last step. Name the jurisdiction. For smaller amounts, note that the magistrate's court or small claims court may be the practical route.
11. General clauses
Your attorney will add the standard ones: the whole agreement, variation only in writing, the addresses for legal notices (domicilium), and how notices are delivered. They look like boilerplate, but they decide how the rest of the contract is enforced.
Common mistakes
- Signing the client's standard terms without reading the liability clause. Some big shippers make the transporter liable for the full invoice value of the goods with no cap.
- Agreeing a fixed rate for a year with no fuel clause.
- Leaving out demurrage, then arguing about it after the first long wait.
- Relying on a verbal promise of volumes.
- Using a template from the internet and changing only the names. A template can help you think through the clauses, but it was written for someone else's business.
Before you sign
- Read the whole document, including any annexures and standard terms it refers to.
- Check the liability clause against your GIT policy with your broker.
- Run the numbers with the fuel clause and a realistic waiting-time estimate.
- Have an attorney review it. For a contract worth months of income, the fee is small by comparison.
- Keep a signed copy where you can find it.
On Transport Contracts
The contracts board lists longer-term transport work that load owners want to award, and the load board covers once-off jobs. If you are a transporter, post your vehicle. If you have regular freight, post a load and get quotes. Accounts are free, and contact details are shown only to logged-in members.